NO |
Project Name |
Customer |
Contractor |
Project Area |
Duration |
Scope of Work |
75 |
SHV-HK |
MPTC |
HMN |
Cambodia, Viet nam
PLGR/RC and continuous tension monitoring for L=1000.234
PLGR Boat: MPP Strider |
30th MAR 25 ~
|
74 |
DSCN (Colombo) |
SLT |
ACPL |
Colombo, Sri Lanka
Underwater submarine optic cable DSE & Clamping |
9th MAR 24 ~ 27th MAR 24 |
73 |
DSCN (Colombo) |
Dhiraagu |
Dhiraagu |
Gadhdhoo, Maldive
Underwater submarine optic cable DSE & Clamping |
14th NOV 23 ~ 1st JAN 24 |
72 |
BIFROST |
ASN |
OMS |
Malaysia,Indonesia, Singapore
PLGR/RC and continuous tension monitoring for L=2278.467Km
PLGR Boat: RV Garda |
11th OCT 23 ~ 9th FEB 24 |
71 |
MIST PH.2 |
OMS |
NEC |
Malaysia,Indonesia, Singapore
PLGR/RC and continuous tension monitoring for L=574.561Km
PLGR Boat: RV Garda & MPP Strider |
14th MAR 23 ~ 21st MAY 23 |
70 |
KLI |
BSNL |
NECTI |
India 8 island
Kiltan,Chetlat,Bitra, Agatti Amini, Kadmat, Kavaratti, Androth
Underwater submarine optic cable clamping |
10th MAR 23 ~ 3rd MAY 23 |
69 |
MIST PLSE |
NEC |
NECTI |
India
DL 1 cable PLSE = 27.236Km
PLSE Boat: MPP Strider |
2nd DEC 22 ~ 22nd FEB 23 |
68 |
ADC |
NEC |
NEC |
Philippines, Vietnam, Thailand
PLGR/RC and continuous tension monitoring for L=1263.122Km
PLGR Boat: RV Garda |
24th SEP 22 ~ 6th DEC 22 |
67 |
IAX |
Subcom |
OMS |
Malaysia, Thailand, Singapore
PLGR/RC and continuous tension monitoring for L=1214.640Km
PLGR Boat: MPP Strider |
7th SEP 22 ~ 18th NOV 22 |
66 |
MIST PH.1 |
NEC |
OMS |
Indonesia EEZ
PLGR/RC and continuous tension monitoring for L=607.193Km
PLGR Boat: RV Garda |
11th AUG 22 ~ 14th SEP 22 |
65 |
PC-2 PLSE |
NEC |
NEC |
Palau
DL 1 cable PLSE = 7.573Km
PLSE Boat: MPP Strider |
28th APR 22 ~ 23th JUN 22 |
64 |
SCIP PH.2 |
HMN |
SBSS |
Phillippines
PLGR/RC and continuous tension monitoring for L=236.088Km
PLGR Boat: MPP Strider |
7th FEB 22 ~ 16th MAR 22 |
63 |
SJC2 S5 PLSE |
NEC |
NEC |
Taiwan
DL 1 cable PLSE = 2.197Km
PLGR/PLSE Boat: MPP Strider |
27th SEP 21 ~ 3rd NOV 21 |
62 |
CDSCN PH.2 |
HMN |
OMS |
Phillippines
PLGR/RC and continuous tension monitoring for L=296.162Km
PLGR Boat: MPP Strider |
12th JUL 21 ~ 30th JUL 21 |
61 |
CDSCN PH.1 |
HMN |
OMS |
Phillippines
PLGR/RC and continuous tension monitoring for L=201.432Km
PLGR Boat: MPP Strider |
3rd MAR 21 ~ 6th APRIL 21 |
60 |
BTOBE (S3,S4) |
NEC |
NEC |
Indonesia EEZ
PLGR/RC and continuous tension monitoring for L=720.097Km
PLGR Boat: RV Garda |
27th FEB 21 ~ 4th FEB 21 |
59 |
SIGMAR |
HMN |
OMS |
Malaka strait, Myanmar sea.
PLGR/RC and continuous tension monitoring for L=1155.816Km
PLGR Boat: RV Garda |
1st DEC 20 ~ 8th FEB 21 |
58 |
SCIP |
HMN |
OMS |
Phillippines
PLGR/RC and continuous tension monitoring for L=503.673Km
PLGR Boat: MPP Strider |
31st OCT 20 ~ 26th DEC 20 |
57 |
BTOBE(S3) |
NEC |
NEC |
South China sea,
PLGR/RC and continuous tension monitoring for L=239.669Km
PLGR Boat: RV Garda |
16th SEP 20 ~ 29th OCT 20 |
56 |
SJC2 PLSE S7 |
NEC |
KT submarine |
Busan, Korea
DL 2 cables
PLSE = 3.452Km
Trenching = 3.452 km
PLGR Boat: RV Garda |
1st JUN 20 ~ 22nd SEP 20 |
55 |
SJC2 Phase 3(S2) |
NEC |
NEC |
South China sea,
PLGR/RC and continuous tension monitoring for L=435.700Km
PLGR Boat: RV Garda |
19th MAY 20 ~ 10th JUL 20 |
54 |
SJC2 Phase 2(S7) |
NEC |
NEC |
East China sea,
PLGR/RC and continuous tension monitoring for L=212.460Km
PLGR Boat: RV Garda |
30th JAN 20 ~ 11th MAR 20 |
53 |
SJC2 Phase 1 (S1.1, S1.2, S2) |
NEC |
NEC |
South China sea, Thai bay
PLGR/RC and continuous tension monitoring for L=1,130Km
PLGR Boat: RV Garda |
4th SEP 19 ~ 27th JAN 20 |
52 |
CANI |
NECTI |
NEC |
Bangal bay
PLGR/RC and continuous tension monitoring for L=567.020Km DL 16 cables, Trenching 10km.
PLGR Boat: RV Garda |
4th MAY 20 ~ 13th NOV 19 |
51 |
INDIGO |
ASN |
Optic Submarine |
Java sea
PLGR/RC and continuous tension monitoring for L=1,194Km
PLGR Boat: MV Wakashio Maru |
4th SEP 18 ~ 15th NOV 18 |
50 |
NCP Seg 3 |
TE Subcom |
KT Submarine |
East China sea
PLGR/RC and continuous tension monitoring for L=611Km
PLGR Boat: MV Cheong hae |
15th APR 18 ~ 26th MAY 18 |
49 |
ASC |
ASN |
Optic Submarine |
Java sea
PLGR/RC and continuous tension monitoring for L=1116Km
PLGR Boat: MV Wakahsio Maru |
3rd APR 18 ~ 2nd JUN 18 |
48 |
IGG Phase 2 |
NEC |
Optic Submarine |
Java sea
PLGR/RC and continuous tension monitoring for L=676Km
PLGR Boat: MV Wakahsio Maru |
30th JAN 18 ~ 1st MAR 18 |
47 |
Chuuk-Pohnpei PLSE |
NEC |
NEC |
Micronesia, Pohnpei
DL 1 cable PLSE = 8.000Km
PLSE Boat: MPP Strider |
5th SEP 17 ~ 4th OCT 17 |
46 |
IGG |
NEC |
Optic Submarine |
Jawa sea
PLGR/RC and continuous tension monitoring for L=606Km
PLGR Boat: MV Wakahsio Maru |
19th JUL 17 ~ 18th AUG 17 |
45 |
NCP 1st phase |
NEC |
KT Submarine |
East China sea
PLGR/RC and continuous tension monitoring for L=605Km
PLGR Boat: RV Cheong hae |
13th JUN 17 ~ 16th JUL 17 |
44 |
Palau-Spur PLSE |
NEC |
KCS |
Micronesia, Palau
DL 1 cable PLSE = 7.583Km
PLSE Boat: MPP Strider |
17th MAY 17 ~ 28th JUN 17 |
43 |
SISTEM KABEL RAKYAT 1 MALAYSA(SKR1M) |
OMS |
Wakashio Marine |
Bay of Thai, South China sea
PLGR/RC and continuous tension monitoring for L=2,925Km
PLGR Boat: MV Wakahsio Maru |
14th JUL 16 ~ 22nd NOV 16 |
42 |
Asia Africa Europe 1(AAE-1) |
NEC |
KT Submarine |
Malaysia domestic, South china sea |
27th MAR 16 ~ 10th JUL 17 |
PLGR/RC and continuous tension monitoring for L=1,164Km
PLGR Boat: MV Wakahsio Maru |
41 |
Sea Me We 5 Cable System(SMW5) |
NEC |
NEC |
Malacca Strait, Bay of Bengal, Andaman Sea |
18th DEC 15 ~ 12th MAR 16 |
PLGR/RC and continuous tension monitoring for L=1,236.9Km
PLGR Boat: MV Wakahsio Maru |
40 |
DDSCN Cable Rerouting |
NEC |
NEC |
Eydhafushi in Maldives |
21st AUG 15 ~ 31st OCT 15 |
ble rerouting for 2 cables |
39 |
Sulawesi Maluku Papua Cable System |
NEC |
KT Submarine |
East Indonesia |
15th JAN 15 ~ 14th APR 15 |
PLGR/RC and continuous tension monitoring for L=1,429.5 Km
PLGR Boat : MV Wakashio Maru |
38 |
Hacheong Jetty Extension |
Geoje City |
Geoje City |
Geoje City in South Korea |
11th DEC 13 ~ 16th JUN 14 |
Jetty extension L=10m B=19.2m |
37 |
Asia Pacific Gateway Cable Network (APG) |
NEC |
KT Submarine |
Singapore, Indonesia, Malaysia, Korea, Thailand, Vietnam, China, HongKong |
9th SEPT 13 ~ 16th OCT 15 |
PLGR/RC and continuous tension monitoring for L=4,361km
PLGR Boat: RV Cheong hae |
36 |
Nammun Jetty Construction |
Changwon City |
Changwon City |
Changwon City in South Korea |
19th JUN 13 ~ 22nd AUG 13
|
Jetty construction L=36.4m |
35 |
CHT-TPKM3(Taiwan to Penghu, Kinmen & Matsu Islands) |
Chuanghwa Telecom |
KT Submarine |
Taiwan Strait |
28th JUL 13 ~ 23rd SEP 13
|
PLGR/RC and continuous tension monitoring for L=404km
PLGR Boat: RV Cheong Hae
|
34 |
00 Project |
Korean Government |
KT Submarine |
Korean Sea |
26th APR
13 ~ 05th MAY 13 |
PLGR/RC and continuous tension monitoring for L=79km
PLGR Boat: RV Cheong Hae
|
33 |
SJC(South-East Asia Japan Cable System) |
NEC
|
KT Submarine |
Philippines |
23rd JAN
13 ~ 23rd FEB 13 |
PLGR/RC and continuous tension monitoring for L=58km
PLGR Boat: RV Cheong Hae
|
32 |
Tse-1 Project
(TAIWAN STRAIT EXPRESS) |
China Unicom,
Chuanghwa
Telecom, Taiwan
Molbile, Far
Eastone, Cable
Network |
S.B.S.S |
Taiwan strait |
15th OCT 12 ~ 3rd NOV 12 |
PLGR/RC and continuous tension
monitoring for L=78km
PLGR Boat: RV Cheong Hae |
31 |
00 project |
Korean Government |
KT Submarine |
Korean Sea |
21th JUN 12
~
16th JUL 12 |
PLGR/RC and continuous tension monitoring for L= 241km
PLGR Boat: RV Cheong Hae |
30 |
Gusan Jetty Extension
|
Changwon City |
Changwon City |
Changwon City |
30th MAR 12 ~ 5th SEP 12 |
Jetty extension 23meters |
29 |
DSCN Cable clamping
|
NEC |
NEC |
Male, Vilingili, Huhumale, LaamuGan&Gadhdhoo |
27th DEC 11
~
15th FEB 12 |
Underwater submarine optic cable clamping |
28 |
DDSCN Cable Landing
|
NEC |
KT Submarine |
Maldives, 8 islands
Kulhuffushi, Eydhafushi, Hulhumale, Dhangethi, LaamuGan, Gadhdhoo, Huamulak, Hithadhoo, Maldives |
19th OCT 11
~
26th DEC 11 |
Diver survey for cable landing site, Cable Landing 12 sites |
27 |
Salvage for Crashed Jumbo 747 cargo plane
|
Asiana Airline |
KT Submarine |
Korea South Sea, 60nm west of Cheju island Salvage crashed 747 airplane from 80m depth by stern trawling ship, MV Cheong Hae |
29th SEPT
~
31st OCT 11 |
26 |
ASE (Asia Submarine-cable Express)
|
ASE (Asia Submarine-cable Express) |
NEC |
Singapore, Indonesia, Malaysia, Hong Kong, Philippines |
2nd AUG 11
~
10th MAY 12 |
PLGR/RC and continuous tension monitoring for L= 1,467km
PLGR Boat: MV Wakashio Maru |
25 |
Underwater Fish Farm Installation
|
Namhae Provincial Government Office |
GDN Inc. |
Southern Sea, Anggang Bay |
10th NOV 10
~
20th JAN 11 |
Stone Laying, Artificial Reef Installation, Seaweed attaching |
24 |
HVDC Power Cable
|
KEPCO, Korea |
LS Cable & KT Submarine |
Korea Main Land ~ Cheju Island |
13th JUN
~
15th JUL 10
&
3rd JUN
~
30th JUN 11 |
PLGR/RC and continous tension monitoring for 200km, Pole#1
PLGR Boat: MV Wakashio Maru |
23 |
IMeWe
Submarine Optic Cable Network
|
NEC |
SBSS |
UAE, India, Pakistan |
9th APR 09
~
1st JUL 09 |
PLGR/RC
and continuous tension monitoring for L=534.758km,
Seg 1.2,
1.3 & 1.5
PLGR Boat: MV Wakashio Mar |
22 |
DSCN
Shore End Protection |
Dhiraagu |
NEC |
Colombo,
Sri Lanka |
23rd DEC 08
~
25th MAR 09 |
UW
video survey, Wire protection, Articulate Pipe installation,
UW rock
drilling and anchoring |
21 |
VSNL Submarine
Optic Cable
|
Tyco |
SBSS |
Hong Kong |
15th APR 09
~
14th MAY 09 |
PLGR/RC
and continuous tension monitoring for L=303.013km, Seg 9
PLGR Boat: MV GPS Pioneer |
20 |
FOBN2 Submarine
Optic Cable
|
Ericsson |
SBSS |
Philippine Luson/Samar, Leyte/Bohol, Cebu/Potuhan, Mindanao, Panay/Negros |
8th DEC 08
~
2nd JAN 09 |
PLGR/RC and continuous tension monitoring for L=48.536km, Seg 9B, 8A, 10A, 14B
PLGR Boat: MV GPS Pioneer |
19 |
Majeon Jetty Construction
|
Masan City Hall |
Masan City Hall |
Majeon
Fishing Port in South Korea |
27th OCT 08
~
25th APR 09 |
Jetty
construction L 40 meters, B 5 meters |
18 |
JAKABARE
Submarine Optic Cable
|
NEC |
KT Submarine |
Indonesia Batam, Pontianak/Kalimantan, Jakarta |
20th OCT 08
~
15th DEC 08 |
PLGR/RC
and continuous tension monitoring for L=1,281.9774km,
Seg B1, B2 & B3
PLGR Boat: MV Wakashio Maru |
17 |
AAG
Submarine Optic Cable |
NEC |
KT Submarine |
Brunei,
Viet Nam, Malaysia, Singapore Strait, Philippines,
Hong Kong |
25th MAR 08
~
17th OCT 08 |
PLGR/RC
and continuous tension monitoring for L=1,769.414km,
Seg S1F, S1B, S1G, S1H, S1i & S2
PLGR Boat: MV GPS Pioneer |
16 |
Kuwait
Oil Company Submarine Optic Cable
|
HHI |
KT Submarine |
KOC
North Pier, KUWAIT |
10th SEP 07
~
14th DEC 07 |
Submarine
Optic Cable Landing 2 lines, Cable burial by jetting,
SBM #23 &24 UW cable fixing work by commercial
diving operation. |
15 |
Trans
Pacific Express
Submarine Optic Cable
|
Tyco |
SBSS/KT
Submarine |
Korea
~ China ~ Taiwan ~ Japan |
9th MAY 07
~
7th MAR 08 |
PLGR/RC
and continuous tension monitoring for L=2,086km,
Seg S1P1, S2E&W, S3S, S3N
PLGR Boat: MV GPS Pioneer |
14 |
Yongho
Jetty Extension
|
Changwon
City Hall |
Changwon
City Hall |
Yongho
Jetty Extension in South Korea |
1st NOV 06
~
28th FEB 07 |
L
16 meters |
13 |
Dhirragu
Submarine Optic Cable Network (DSCN) |
NEC |
KT Submarine |
Sri
Lanka: Colombo
Maldives: Male, Hulumale, K Vilingili, Laam Gan,
Gadhdhoo total 5 islands
|
3rd OCT 06
~
23rd DEC 06 |
Cable
Landing, Articulated piping, UW Video log, Rock
anchoring at water depth 50 meters. |
15th FEB 07
~
28th MAR 07 |
Colombo,
Sri Lanka 1 cable,
Male 2 cables, Hulumale 2 cables,
K Vilingili 1 cable,
Laam Gan 1 cable,
Gadhdhoo 1 cable ,
Total 6 cable landing |
3rd JUL 07
~
30th AUG 07 |
12 |
JASUKA
Submarine Optic Cable
|
Tyco |
SBSS/KT
Submarine |
Batam
~ Kalimantan & TJ Pandan ~ TJ Pakis, Indonesia |
25th OCT 05
~
05th DEC 05 |
PLGR/RC
and continuous tension monitoring for L=1,027km,
Seg 1 & 2
PLGR Boat: MV GPS Pioneer |
11 |
TIISCS
Submarine Optic Cable Seg
1D & E
|
Tyco |
SBSS |
Singapore
strait, Indonesia & Malaysia, Malacca Strait |
20th MAY 04
~
10th JUL 04 |
PLGR/RC
and continuous tension monitoring for L=650km, Seg
1D & E
PLGR Boat: MV Permina Supply 26 |
10 |
TIISCS Submarine Optic Cable Seg 1
C, D
|
Tyco |
KT Submarine |
Malacca Strait |
6th MAY 04
~
14th JUL 04 |
PLGR/RC
and continuous tension monitoring for L=359.5km. Seg 1C & D
PLGR Boat: MV GPS Pioneer |
9 |
Korean
Navy Submarine Optic Cable cable
|
Korean
Navy |
KT Submarine |
East
Sea of Korea |
9th SEP 03
~
29th SEP 03 |
PLGR/RC
and continuous tension monitoring for
L 3km
PLGR Boat: MV GPS Pioneer |
8 |
FNAL
Phase 2 Submarine Optic Cable |
Alcatel |
KT Submarine |
Busan
Song Zong Bay, Korea ~ West Sea of Japan KP484 |
9th JAN 02
~
15th APR 02 |
PLGR/RC
and continuous tension monitoring for Route L=351km,
PLGR Boat: MV Ocean Star |
7 |
FNAL
Phase 1 Submarine Optic Cable |
Alcatel |
KT Submarine |
Busan
Song Zong Bay, Korea ~ to Tsushima Is. Japan |
5th NOV 01
~
27th NOV 01 |
PLGR/RC
and continuous tension monitoring for Route L=36km
PLGR Boat: MV Ocean Star |
6 |
C2C
3C1 Submarine Optic Cable
|
TyCom |
KT Submarine |
Busan,
Korea ~ Southwest of Japan |
5th JUL 01
~
27th OCT 01 |
PLGR/RC
and continuous tension monitoring for Route L=832km
PLGR Boat: MV Ocean Star |
5 |
East
Asia Crossing (EAC) Submarine Optic Cable
|
Global
Marine |
KT Submarine |
Shindu
Ri, Korea ~ Korean Territory #64 POL |
1th MAY 01
~
9th JUN 01 |
PLGR/RC
and continuous tension monitoring for Route L=87km,
Seg KW
PLGR Boat: MV Ocean Star |
4 |
East
Asia Crossing (EAC) Submarine Optic Cable
|
Global
Marine |
KT Submarine |
Shindu
Ri, Korea ~ Korean Territory #43 Transition |
6th NOV 00
~
4th DEC 00 |
PLGR/RC
and continuous tension monitoring for Route L= 100km,
Seg F3
PLGR Boat: MV Ocean Star
|
3 |
Cheju
No 3rd Submarine Optic Cable |
Korea
Telecom |
KT Submarine |
Korea
Namhae Song Zong Bay~Cheju Sungsan Po |
13th MAR 00
~
10th APR 00 |
PLGR/RC
and continuous tension monitoring for Route L= 236km
PLGR Boat: MV Ocean Star |
2 |
APCN
Submarine Optic Cable Reroute
|
Japan
KDD-SCS |
KT Submarine |
Between
Korea and Japan (JB101-R-A ~ JB102-R-B) on the Straits
of Korea |
13th JUL 99
~
24th JUL 99 |
R
PLGR/RC and continuous tension monitoring for oute
L= 44km
PLGR Boat: MV Ocean Star |
1 |
China
US Submarine Optic Cable Seg #2 and #4
|
KDD-SCS |
KT Submarine |
Korea
Busan Song Zong Bay ~ West of Kagoshima, Japan BU#1,
BU#2 |
14th JAN 99
~
9th MAY 99 |
PLGR/RC
and continuous tension monitoring for Route L= 1,226km,
Seg #2 & #4
PLGR Boat: MV Ocean Star |
NO |
Project
Name |
Customer |
Contractor |
Project Area |
Duration |
Scope of Work |
19 |
Submarine
Power Cable
|
KEPCO |
KT Submarine |
Bathymetry
Survey, Side Scan Sonar, 1.2 kilometers |
25th JUN 07 ~ 10th JUL 07 |
Route
Survey |
Sub
Bottom Profiling, Cable Landing Barge Positioning |
Yeonpyung
island, Inchon |
Core
Sampling, GPS Geodetic Surveying |
18 |
Submarine
Power Cable
|
KEPCO |
KT Submarine |
Bathymetry
Survey, Side Scan Sonar, 2.4 kilometers |
20th JAN 07 ~ 20th AUG 07 |
Route
Survey |
Sub
Bottom Profiling, Cable Landing Barge Positioning |
Dot
island, Masan Harbor |
Core
Sampling, GPS Geodetic Surveyingg |
17 |
Submarine
Power Cable
|
KEPCO |
KT Submarine |
Bathymetry
Survey, Side Scan Sonar, 1.4 kilometers |
30th JUL 05 ~ 25th AUG 05 |
Route
Survey |
Sub
Bottom Profiling |
Keomun
island |
Core
Sampling, GPS Geodetic Surveying |
16 |
Submarine
Power Cable
|
KEPCO |
KT Submarine |
Bathymetry
Survey, Side Scan Sonar, 2.4 kilometers |
20th JUL 05 ~ 20th SEPT 05 |
Route
Survey |
Sub
Bottom Profiling |
Cheju
island |
Core
Sampling, GPS Geodetic Surveying |
15 |
Bathymetry
Survey for
|
Hyundai Heavy
Industries |
DongJin Offshore |
Bathymetry
Survey for |
28th JUN 02 ~ 27th JUL 02 |
FSO
Vessel Launching Survey |
FSO(Floating
Storage £¦ Offloading) Launching Zone |
14 |
East
coast area
|
Agency for
Defense Dev. Korean Government |
LG INNO-Tech |
East
coast area LP Survey for Korean Navy (WGS84) |
3rd APR 02 |
LP
Survey |
Topography
Survey |
for
Korean Navy |
|
13 |
C2C
Submarine Cable
|
TyCom Ltd/USA |
KT Submarine |
7Km
Landing Route Survey on Suyoung Bay, Busan |
05th JUN 01 |
Barge
Laying Control Survey |
GPS
Surveying for control point and BMH |
|
Laying
Barge Control |
12 |
No.1
Buoy in Busan Harbor
|
Korea Hydro
Office |
DAEKI Marine |
GPS
Positioning for Busan Port No.1 Buoy installation |
13th
JAN 01 |
|
in
Busan harbor |
|
Derrick
Barge Control |
11 |
EAC
Submarine Cable |
Global Marine/UK |
KT Submarine |
8Km
Landing Control Survey on Shindu Ri Bay, Korea |
NOV 00 |
Barge
Laying Control Survey |
Laying
Barge Control |
10 |
Busan
Harbor VTS Station Radar Scanner Positioning |
Korea Hydro Office |
GDN |
GPS
Static Surveying for VTS Center in Busan Harbor |
12th APR 00 ~ 1st MAY 00 |
(WGS
84). Geodetic Positioning Survey |
9 |
New
APCN Submarine Optic Cable Landing Route Survey
|
KT Submarine |
Korea Subsea
Development |
Route
Investigation for Existing Cable on Songzong Bay |
FEB 00 |
Yeonpyung
island, Inchon |
GPS
Topographic surveying and leveling |
8
|
Cheju
3rd Landing on Namhae
|
Korea Telecom |
KT Submarine |
4Km
DGPS Landing Route Survey on Namhae for Cheju No.
3rd Cable |
FEB
00 |
Barge
Laying Control Survey |
Laying
Barge Control |
7 |
Cheju
3rd Landing
|
Korea Telecom |
KT Submarine |
4Km
DGPS Landing Route Survey on Cheju Is. |
FEB
00 |
on
Cheju Is. |
for
Cheju No. 3rd Cable |
Barge
Laying Control Survey |
Laying
Barge Control |
6 |
CHINA-US
#2 and #4 Landing
|
KDD-SCS |
KT Submarine |
6Km
DGPS Landing Route Survey on Songzong Bay, Busan |
JUL
98 |
Barge
Laying Control Survey |
GPS
surveying for control point and BMH |
|
Laying
Barge Control |
5 |
SEA-ME-WEST
3 Cable
|
NTT |
KT Submarine |
3Km
DGPS Landing Route Survey on Keoze Is., Korea |
JUN
98 |
Barge
Laying Control Survey |
GPS
surveying for control point and BMH |
|
Laying
Barge Control |
4 |
No.
2nd Busan Bridge
|
Busan City Hall |
Hanjin Constr. |
Section
on Songdo, Busan |
27th
DEC 96 |
Construction
Control Points |
Establishing
the Control Points and Network |
3 |
Hydro
Survey for Dongkuk
|
Busan City |
Daesung Eng |
Hydro
Surveying and Seabed Sampling for 396 ha, |
DEC
96 |
Hydro
Survey for Dongkuk |
Shore
Line Surveying by CPD RTK GPS and Echosounder |
2 |
Seo
Hae HWY Bridge
|
Korea HWY Office |
Daelim |
GPS
Control Surveying for bridge construction |
APR
96 |
Control
Point Survey |
|
1 |
Kwangan
Bridge Construction Control Point Survey
|
Busan City Hall |
GDN |
GPS
Static and CPD RTK for control points and file head
for offshore piling |
MAR 96 |